A. Crane/hoist. You need either a crane or
forklift to unload panels from the truck at your site. Sometimes
we can ship with a crane truck, and use this to unload
your panels. It will typically take 1-3 hours to unload, organize
and place your panel bundles on stickers at your site.
You also need a crane to fly in your
roof panels once you trim these to final size. It is possible, but
difficult to place roof panels by hand using winches or pulleys.
We strongly recommend you use a crane for this! An experienced crew
can panel an average-sized roof with about 6-10 hours crane time.
To achieve this efficiency, youll need to pre-cut (see
Figure 10a) and pre-nail (see
Figure 10b) your roof panels.
Youll place most wall panels by hand. Sometimes
youll need a crane - for example
on a steeply sloping site, or to panel your second or third floor.